Apparel · FastReactPlan

Production Planning, visualised.

Visual drag-and-drop production planning and coordination software, designed specifically for apparel, textile and footwear manufacturers.

500+Clients worldwide
40+Countries
2,000+Factories planned
<12moTypical ROI

Dynamic production planning

One visual plan, from order to dispatch

FastReactPlan is the market-leading apparel production planning solution — supporting faster order confirmation and optimised production plans. A single, highly visual drag-and-drop interface handles master planning across multiple factories and the scheduling of individual lines and machines.

Built on LEAN just-in-time principles, it reduces inventory and lead time while dynamically managing critical pre-production activities and material requirements — so capacity, materials and critical path are coordinated in one place.

Core features

Everything a planner needs, in one board

Macro Capacity Planning
A top-down view of factory loading — move orders between locations, plan reservations or projections, with colour-coded warnings and full sync to line-level plans.
Integrated Critical Path (T&A)
Time & action templates by customer or lead time, with individual or team assignments and priorities driven by the live production plan.
Secondary Processes & Machinery
Dynamically schedule cutting, printing, finishing and packing in step with the main sewing, knitting or dyeing plan — accounting for machine availability.
Quick Tools for Planners
Order splitting, multi-order updates, plan sorting and offline what-if scenario analysis — built for the way planners actually work.
Line-Level Capacity Planning
Drag-and-drop line or machine planning with warnings for late delivery and critical-path issues. Efficiency profiles and learning curves keep it accurate.
Raw Materials Availability
A LEAN pull system links the bill of materials to the plan. An optional MRP module shows demand vs. supply by importing stock data from your ERP.
WIP Warnings
Imports produced quantities from ERP or the Res.Q tracking system and raises proactive alerts on work-in-progress issues before they cause delays.
In-built Report Designer
Best-practice standard reports plus a customisable builder — export to database tables to feed dashboards and MIS.

Advanced & optional modules

Scale up as your operation grows

Advanced Automated Planning
Rule-based automated scheduling at macro and detailed levels — ideal for high order volumes with fixed allocation rules.
Embellishment / Washing Planning
Semi-automated multi-process planning, synchronised with primary capacity plans for outsourced print, embroidery and wet/dry processes.
Synchronised Multi-process Planning
Detailed machine/line planning across processes — built for textile manufacturers coordinating knitting/weaving and dyeing.
Materials Requirement Planning
Quantitative material availability with traffic-light status, importing expected deliveries, stock levels and issued quantities from ERP.

Why FastReactPlan

Unique. Trusted. Rapid. Proven.

Unique

Capacity, materials and pre-production critical path — dynamically managed in a single, highly visual and intuitive solution.

Trusted

The market-leading apparel production planning and control solution: 500+ clients across 40+ countries and 2,000+ factories.

Rapid

Developed and delivered by industry experts. The visual, easy-to-use interface drives rapid adoption and faster benefits.

Proven

Significant, measurable, sustainable gains in productivity, OTDP, cost and lead time — with a typical ROI under 12 months.

Typical business benefits

Measurable improvements, fast

3–10%Increase in productivity
10–30%OTDP improvement
10–30%Reduction in lead times

In their words

Trusted by the industry's leaders

FastReactPlan has facilitated dealing with complexity, coping with challenging requirements as customers order closer to market and order books fragment.
Ashraf Omar CEO, Brandix Group
FastReactPlan provides visibility and coordination — minimising errors and highlighting potential problems quickly for immediate resolution.
Shirendra Lawrence Managing Director, MAS Active
Advance issue highlighting enabled prompt decisions, improved material availability and increased PCD hit rates — contributing to a 12% sales increase.
Stephen Samraj Director, Voguetex
See FastReactPlan running your production floor.
Book a demo →